Guide

What Region C fixings actually mean

Why Townsville roofs need closer fastener spacing and heavier tie-down, what it adds to a quote, and the questions worth asking any roofer.

5 minute read

What Region C is

Australia's wind loading standard splits the country into regions, and Townsville sits in Region C, the cyclonic classification that runs up most of the Queensland coast. It is not a description of how windy it is on an average day. It is an engineering figure for the wind load a structure has to be designed to survive, and a roof built to it needs closer fastener spacing, mechanically fixed perimeter tiles and heavier tie-down than the same roof built to a milder region further south.

None of that is optional and none of it is a sales upsell. It is the code for this postcode, the same as a stump height or a slab thickness is the code for a different postcode. A quote that has not accounted for it is quoting a different, lighter job than the one your house actually needs.

What actually changes

Three things, on every job.

  1. 01Fastener spacing tightens. More screws, more fixing points, closer together, on both a re-roof and a repair.
  2. 02Perimeter, ridge, hip and verge tiles are mechanically fixed as well as bedded, because bedding alone is not rated to hold in a Region C wind event.
  3. 03Tie-down is engineered for the span and site exposure, which is what a fixing schedule on a re-roof quote is actually specifying.

What it costs

Roughly eight to twelve per cent over what the same job would cost in a non-cyclonic region, mostly in fastener count and the labour to fix a smaller amount of roof at a time properly rather than gunning it down fast. On a re-roof that is a real number worth having in writing before you compare quotes, because a quote that has skipped it will always look cheaper and will always be a different job.

On a repair the cost difference is smaller and easier to miss entirely, which is exactly why we specify it on small jobs too rather than only on the big ones. A perimeter tile that is bedded but not mechanically fixed is a Region C non-compliance whether it is one tile or one hundred.

What to ask

Four questions for any roofer's quote.

  • Is the fastener spacing and fixing schedule for wind Region C, or has it been quoted to a milder region and hoped nobody checks?
  • Are the perimeter, ridge, hip and verge tiles mechanically fixed as well as bedded, not just bedded?
  • For a re-screw or re-roof, what fastener type and spacing is specified, and can it be shown in the quote rather than described in a sentence?
  • Does the quote separate what Region C adds, or is it folded in so two quotes cannot actually be compared?

See it costed

Every quote spells it out.

Region C fixings are specified and priced on every quote we write, big or small, so there is nothing to find later.

See the re-roofing service