Replacement

Re-roofing and roof replacement

A full roof replacement engineered and fixed for a cyclone region, so you can stop thinking about it.

$13,500 to $38,000 4-10 days depending on size and weather Townsville, Thuringowa and the northern beaches, from Alligator Creek up to Bushland Beach
A dry, warmly lit lounge room after the repair, pots and buckets put away, from the film

What it covers

Re-roofing and roof replacement

Price
$13,500 to $38,000
On site
4-10 days depending on size and weather
Category
Replacement
Fixed to
Wind Region C
Included
6 items

There comes a point where re-bedding and re-screwing are just deferring the decision, and on a roof past thirty-five years in this climate that point usually arrives all at once. A re-roof from us starts with the structure, not the sheeting: batten condition and spacing checked, tie-down assessed for the span, and the fixing schedule set to wind Region C before anything comes off. We strip and re-sheet or re-tile in sections so the house is never open overnight, replace sarking, flashings, valleys and guttering as part of the job rather than as extras, and hand over the certification you will want when you sell.

Included in the price

  • Batten condition, spacing and tie-down assessed before the quote is written
  • Fixing schedule set to wind Region C for the span and site exposure
  • Full strip and replacement of sarking, flashings and valleys
  • New guttering and correctly sized downpipes included in the scope
  • Old roof removed and disposed of, and the site magnet-swept for fasteners
  • Ten-year workmanship warranty plus the material manufacturer's own warranty

On the day

How this one runs.

  1. 01 Inspect the roof space, battens and tie-down and measure the roof
  2. 02 Present the material options with the real cost difference between them
  3. 03 Fixed written quote, QBCC contract and home warranty insurance
  4. 04 Strip and replace in sections, never leaving the house open overnight
  5. 05 Fit new flashings, valleys, guttering and downpipes
  6. 06 Final inspection, hose test, photo handover and certification
A detail from a Stuart Ridge Roofing job, Kirwan
Photographed as we go, so what you get matches what was quoted.

What it costs

$13,500 to $38,000

Replacing an existing steel roof runs $13,500 to $26,000 for a typical single-storey home; going tile to steel runs $19,000 to $34,000 including batten work, and a large or two-storey home reaches $38,000; Region C fixings and tie-down add roughly eight to twelve per cent over a non-cyclonic region, and battens needing replacement are quoted before we proceed

Book a re-roof assessment

Re-roof or restore

When repair stops being the answer.

Re-bedding and re-screwing are the right call for most of what comes through the roof space. There is a point where they are just deferring the decision, and on a roof past thirty-five years in this climate that point usually arrives all at once.

Restoration: re-bed, re-screw, repair

The right call when the roof structure is sound and the failures are local: a section of ridge capping, a run of perished screws, a valley that has rusted through.

  • Fixes the specific failure without touching the whole roof
  • A day to a few days, not a week
  • Costs a fraction of a full replacement
  • Buys years, not decades, and the next failure may be elsewhere

Full re-roof

The right call once the sheeting or tile itself, the battens or the tie-down are the problem, not any one repair.

  • Batten condition and tie-down assessed and fixed to Region C throughout
  • New sarking, flashings, valleys and guttering as part of the job
  • Ten-year workmanship warranty plus the manufacturer's own
  • $13,500 to $38,000, four to ten days depending on size

Tile or metal, if you are replacing

Asked every week

Asked about this one.

Tile or steel for Townsville?
Both work here if they are fixed properly. Steel is lighter, faster to install and easier to insure; tile holds heat out better and is quieter in heavy rain. The honest answer usually comes down to the existing structure, and we go through it on site.
What happens if it rains mid-job?
We only strip what we can re-sheet the same day, and everything open goes back to weathertight before we leave. Between November and April we watch the radar every morning and will move a day rather than open a roof into a storm.
My house is from the seventies. Could there be asbestos?
Possibly, in the sheeting or the eaves lining if it has not been replaced. We do not disturb it. We stop, have it tested, and a licensed removalist does that part before we go on.
Do I need council approval?
A like-for-like replacement generally does not. Changing from tile to steel can change the structural loading and sometimes needs building approval, and we will tell you before you sign anything if yours is one of those.

On this service

Reviews left for re-roofing and roof replacement.

  • Full re-roof, tile to steel, nine days. Never left the house open overnight and they magnet swept the yard afterwards, which I did not know was a thing. Kids and dog thank them.

    Mick F., Deeragun

Next step

Book a re-roof assessment

Ring (07) 5550 0110 or send the form and we will confirm a time. Most first visits are inside the week.

Book a roof check

Also worth knowing

  • Five-year workmanship warranty on leak repairs. If the same leak comes back in that time, we fix it at no charge.
  • Ten-year workmanship warranty on full re-roofing, on top of the material manufacturer's own warranty on the sheeting or tile.
  • Every leak repair is hose-tested before we come off the roof, and the photos come to you the same day.
  • Fixed written quote before we start. Variations are priced and agreed in writing before anyone picks up a tool.
  • No call-out fee to come and look at a leak anywhere inside our service area.

Ask about re-roofing and roof replacement

Tell us what is going on and we will reply with a time, and a price where we can give one without seeing the roof.

or call (07) 5550 0110

This is a demonstration form. Nothing is sent and nothing is stored.